Skip to content
Planning Drawings020 7131 9705Get a fixed fee
Menu
The red-brick side of a house with a slate-roofed bay window and a white downpipe

Fire strategy plan for £425

When a house becomes flats or a shared home, building control and the licensing officer both ask the same question: how does everyone get out? We draw the answer.

£425 fixed fee, no VAT to add

Get a fixed fee for your house

We will send your fixed fee here.

Handy if a quick call is easier.

We check conservation areas and other limits for this address.

In a sentence or two: your plans, and any feedback from the council so far.

Optional. PDF, JPG, PNG, HEIC or DWG. Up to 10 files, 28 MB in total.

Write before 3pm and you hear back that working day.

We use your details only to answer this enquiry. Read our privacy notice.

Prefer WhatsApp? Send us a message · +44 7592 201353

The short answer

A fire strategy plan shows how a building is made safe in a fire: escape routes, doors, partitions, alarms and the separation between flats or bedrooms. It supports the building regulations application and an HMO licence. Our fee is £425, no VAT to add, with no survey needed if we already hold one.

Fire strategy plan

from £425

Fixed fee
£425
VAT
None to add
  • A plan of every floor with the escape routes marked, from each room to the final exit
  • Fire doors and fire-resisting partitions shown, with the rating each needs
  • Detection and alarm layout: where smoke and heat alarms go, and the system grade
  • Escape windows for basement and upper rooms, with the openable size checked
  • The compartment lines between flats or units, and how pipes and cables pass through them
  • A short statement setting out the strategy, in a form building control and a licensing officer can read

£425. A starting fee: we confirm one fixed figure after checking your address. The council’s own fee, where there is one, is paid to the council.

Get my fixed fee

How the plan is produced

  1. Use the survey

    We work from the measured survey of the house, with its stairs, floors and openings.

  2. Choose the strategy

    We decide whether the stair is protected, whether a sprinkler or other route is better, and where each unit’s escape lies.

  3. Draw it

    Escape routes, doors, partitions and alarms go onto the plans, with ratings noted.

  4. Statement

    A short statement explains the strategy and the standards it follows.

  5. Submit and answer

    The plan goes with the building regulations application and, for an HMO, the licence, and we answer the officers.

Why a conversion triggers the fire rules

Turning a house into flats or a shared house is a material change of use under regulation 5, because the building gains rooms for residential purposes. That brings the fire safety requirements of building regulations into play for the whole building, not only the new part.

The guidance in Approved Document B is written for dwellings, and a conversion into several units is judged against it with the extra care that shared stairs and hallways need. Where it does not fit, we say so and explain the alternative route.

The rules we draw to

Every dwelling needs a fire detection and alarm system, at least Grade D2 Category LD3, with mains-powered alarms and a standby supply. A large dwelling of three or more storeys needs Grade A Category LD2, according to Approved Document B. Where a new storey is created above 4.5 metres, fire doors rated E 20 and partitions rated REI 30 protect the escape route.

A basement room used for living needs either an emergency escape window or door, or a protected stair to a final exit. An escape window must open to at least 0.33 square metres, with a clear height and width of at least 450 millimetres and its bottom edge no more than 1,100 millimetres above the floor.

  • Alarms: Grade D2 Category LD3 at least; Grade A LD2 for large three-storey homes
  • Protected escape route above 4.5 m: E 20 doors and REI 30 partitions
  • Escape window: 0.33 m² openable, 450 mm clear, 1,100 mm cill height at most

Fire and the HMO licence

A licensed HMO is inspected by the local housing authority, and operating one without a licence is an offence under section 72 of the Housing Act 2004. Councils set their own fire standards for licences, often above the building regulations minimum, so the plan is drawn to the stricter of the two.

We tell you what your council asks for before the plan is final, and show the same strategy on the licence drawings and the building regulations drawings, so you answer one set of questions, not two.

HMO conversion drawings · HMO licence application pack

Fire rules in numbers

Questions about fire strategy

Is a fire strategy the same as a fire risk assessment?

No. The strategy is the design: how the building is made safe. A fire risk assessment is a continuing check on a building in use, and the person responsible for the building carries it out.

Do I need sprinklers?

Not always. The guidance gives a sprinkler-based route as an alternative for some open-plan layouts, and a protected stair is the usual route. We compare the two for your house.

Do you issue the fire certificate?

There is no certificate. Building control approves the design and inspects the work, and a licensing officer inspects an HMO. Our plan is what they check against.

Do I need a survey as well?

We need an accurate survey to draw the plan. If we have already surveyed the house for drawings, we use it, and if not, we can arrange one.

Get everyone out, on paper and in practice

Send the address and the use you plan. We reply with the scope and a fixed fee, from £425.