
Retrospective planning applications from £625
Already built, or halfway there, without the permission it needed? We measure what stands, draw it as built, write the case and submit it to your council for a fixed fee.
£625 £475 drawings + £150 survey (£625 total), no VAT to add
Prefer WhatsApp? Send us a message · +44 7592 201353
The short answer
A retrospective application asks the council to grant permission for work that already exists, under section 73A of the Town and Country Planning Act 1990. It is judged like any other application, on the same plans and policies. Our fee is £475 drawings + £150 survey (£625 total), no VAT to add; the council fee is separate.
Retrospective planning application
from £625
- Drawings
- £475
- Measured survey
- £150
- Total you pay
- £625
- VAT
- None to add
- A measured survey of the work as it stands, plus the house and the boundaries
- Existing and as-built plans, elevations and a section, with location and block plans
- A short planning statement that sets out why the work is acceptable
- The forms, the ownership certificate and the submission to your council
- Answers to the planning officer, and redraws of our drawings until approval
- An independent check of the set before it goes in
£475 drawings + £150 survey (£625 total). A starting fee: we confirm one fixed figure after checking your address. The council’s own fee, where there is one, is paid to the council.
Get my fixed feeHow a retrospective application runs with us
Tell us what was built
Send the address, a few photos and any letter from the council. We check the planning history and any enforcement notice first.
We survey what stands
One visit to measure the extension, loft or outbuilding as built, and the neighbours’ windows that the officer will look at.
Drawings and the case
We draw the work exactly as it is, never as it was meant to be, and write the statement that answers the policies it touches.
Submission
We submit through the Planning Portal with the forms and the council fee, and tell the enforcement officer, if there is one, that it is in.
Officer questions
We answer the officer and redraw at no charge until a decision. If changes on site would win permission, we draw those too.
When a retrospective application is the right move
Most of our retrospective jobs start with one of three things: a letter from the council’s enforcement team, a buyer’s solicitor asking for the planning paperwork, or a neighbour’s complaint. In each case the quickest way to settle the question is usually to put the work in front of the council properly, with drawings that match what is on the ground.
Sometimes no application is needed at all. If the work fits permitted development, a Lawful Development Certificate proves it is lawful instead, and we will tell you so before you pay for anything else.
- An extension, loft dormer or outbuilding built bigger than permitted development allows
- Work that departs from the approved drawings: a deeper extension, a different roof, new windows
- A building used for something it has no permission for, such as a garden room let out as a flat
What happens if you do nothing
Building without permission is not itself a criminal offence, but ignoring an enforcement notice is, and the council can serve one for years after the work is finished. For operational work substantially completed on or after 25 April 2024, the Planning Practice Guidance gives councils 10 years to act.
Councils use these powers. In April to June 2026 alone, English councils issued 1,071 enforcement notices, according to the GOV.UK planning statistics. A sale can stall long before that point, because the buyer’s solicitor will ask for the permission.
You get one clear chance, so make it count
The guidance is blunt: a person has only one opportunity to get permission after the event. Once an enforcement notice has been issued, the council can decline to decide a later retrospective application under section 70C, and an appeal on the planning merits may be closed off too.
That is why we draw the work exactly as built, deal with the neighbour’s window and the boundary first, and suggest any small change on site that would make the scheme acceptable before the application goes in.
Retrospective planning by the numbers
10 years
How long a council has to take enforcement action against building work substantially completed on or after 25 April 2024.
Source: Planning Practice Guidance: enforcement and post-permission matters (GOV.UK)
4 years
The time limit that still applies to building work substantially completed before 25 April 2024.
Source: Planning Practice Guidance: enforcement and post-permission matters (GOV.UK)
£548
The council fee for a householder application on one house from 1 April 2026, and a retrospective application pays a planning fee too (GOV.UK fee schedule).
Source: Planning fees: annual indexation from 1 April 2026 (GOV.UK)
3.8%
The rise in every planning fee on 1 April 2026, in line with CPI for September 2025; fees now rise each April, capped at 10%.
Source: Planning fees: annual indexation from 1 April 2026 (GOV.UK)
1,071
Enforcement notices issued by English district councils in the three months April to June 2026, alongside 1,378 planning contravention notices.
Source: Planning applications in England: April to June 2026 (GOV.UK)
93%
Share of householder applications English councils decided within 8 weeks or an agreed extension in the year ending June 2026.
Source: Planning applications in England: April to June 2026 (GOV.UK)
21 days
The time you have to answer a planning contravention notice; failing to complete and return it is an offence.
Source: Planning Practice Guidance: enforcement and post-permission matters (GOV.UK)
1 chance
Councils can decline to decide a retrospective application once an enforcement notice has been issued (section 70C).
Source: Planning Practice Guidance: enforcement and post-permission matters (GOV.UK)
Questions about retrospective planning
Can I sell a house with an extension that never had planning permission?
You can, but the buyer’s solicitor will usually ask for the permission or proof that the work is lawful, and a lender may want the same. A retrospective application, or a Lawful Development Certificate where the work was permitted development, gives them the paper they are looking for.
Will the council treat me worse because I built first?
The application is judged on its planning merits, the same as one made before building. The guidance asks councils to act proportionately, and many breaches are settled by an application rather than enforcement.
Source: Planning Practice Guidance: enforcement and post-permission matters (GOV.UK)
What if the application is refused?
Talk to us before anything else happens. A refusal can lead to an enforcement notice, and the options narrow after that. Often a smaller change on site, drawn and submitted again, is what gets the work accepted; our redraws of the drawings are free until approval.
Do I also need building regulations approval?
Usually, yes: planning and building regulations are separate. For building work already done, the council’s building control team handles a regularisation application, and we draw that set too.
Get the work on paper, the right way
Send the address, what was built and any council letter. We reply with the route and a fixed fee, from £475 drawings + £150 survey (£625 total).