
Regularisation drawings from £765
Built or converted without building regulations approval? We survey what exists, draw it as built and prepare the application for the council’s regularisation certificate.
£765 £615 drawings + £150 survey (£765 total), no VAT to add
Prefer WhatsApp? Send us a message · +44 7592 201353
The short answer
Regularisation is the route for building work carried out without building regulations approval. You apply to the building control authority, which may ask to see work opened up, and may issue a regularisation certificate. Our fee is £615 drawings + £150 survey (£765 total), no VAT to add; building control sets its own charge.
Regularisation drawings
from £765
- Drawings
- £615
- Measured survey
- £150
- Total you pay
- £765
- VAT
- None to add
- A measured survey of the finished work: structure, openings, stairs, insulation where visible, drains and ventilation
- As-built plans and sections, with the description of the unauthorised work the application needs
- A drawing of any additional work likely to be needed to bring the work up to the rules of its time
- The written application for a regularisation certificate, prepared for you
- A list of the places building control may ask to open up, so you can plan for it
- An independent check of every sheet, and free redraws of our drawings until approval
£615 drawings + £150 survey (£765 total). A starting fee: we confirm one fixed figure after checking your address. The council’s own fee, where there is one, is paid to the council.
Get my fixed feeHow regularisation runs with us
What was built, and when
We establish the date the work was finished, because the standards that apply are those in force when it was carried out.
Survey
We measure and photograph the work, noting the beams, bearings, insulation and drainage that can be seen.
Drawings
As-built drawings and a list of what is concealed and may need opening up.
Application
The application goes to the council or to a registered approver, with the description and plans the regulation asks for.
Inspection and certificate
Building control inspects, may ask for tests or opening up, and issues a certificate or lists the work still needed.
What a regularisation certificate is, and is not
Regulation 18 applies where unauthorised building work has been carried out on or after 11 November 1985. The owner applies in writing with a description of the work, plans of it and, so far as reasonably practicable, plans of any additional work needed to make it comply with the requirements that applied when it was done (regulation 18).
The authority may require reasonable steps, including laying open the work and making tests. A certificate, if given, is evidence but not conclusive evidence that the requirements were met. It is still what a buyer’s solicitor and a lender look for.
- For work done on or after 11 November 1985 without approval
- Judged against the rules in force when the work was done
- May involve opening up concealed structure, drains or insulation
Why not leave it alone?
Breaking the building regulations is an offence under section 35 of the Building Act 1984, with a maximum on indictment of two years in prison or a fine. The council can also serve a notice requiring offending work to be removed or altered, but not after 10 years from the completion of the work (section 36).
In practice the trigger is usually a sale or a remortgage: without the certificates, the buyer’s solicitor will ask for a regularisation certificate or indemnity insurance. The GOV.UK guide says the same, that without approval you will not have the compliance certificates you need when you sell.
Planning is separate
A regularisation certificate deals only with building regulations. If the work also needed planning permission and did not get it, that is a separate matter, and a retrospective planning application is the remedy. We handle the two together where both are needed, from one survey.
Tell us at the start what you know about the work: when it was built, by whom, and whether any approval was ever sought. It saves visits.
Retrospective planning application · Building regulations drawings
Regularisation in numbers
11 Nov 1985
Regularisation applies to unauthorised work carried out on or after this date.
Source: Building Regulations 2010, regulation 18: regularisation (legislation.gov.uk)
10 years
The time limit for a council to serve a notice to remove or alter offending work, from the date of completion.
Source: Building Act 1984, section 36: removal or alteration of offending work (legislation.gov.uk)
2 years
Longest prison term on indictment for contravening the building regulations, or a fine, or both.
Source: Building Act 1984, section 35: penalties for contravening building regulations (legislation.gov.uk)
Evidence
A regularisation certificate is evidence, but not conclusive evidence, that the requirements have been met.
Source: Building Regulations 2010, regulation 18: regularisation (legislation.gov.uk)
2
Plans the application must include so far as practicable: the unauthorised work, and any additional work required.
Source: Building Regulations 2010, regulation 18: regularisation (legislation.gov.uk)
Questions about regularisation
Will they make me knock it down?
The council has power to require removal under section 36, within 10 years of completion. The more usual route is a list of work needed, such as a lintel, insulation or a fire door, then a certificate once it is done.
Is it cheaper to take out indemnity insurance?
Indemnity insurance covers the risk of enforcement but does not prove the work is safe or compliant, and some lenders still ask for the certificate. We can explain both and you decide.
What if the work was done by a previous owner?
The current owner may apply. The regulation allows the owner to apply, and we survey what is there, whoever built it.
Source: Building Regulations 2010, regulation 18: regularisation (legislation.gov.uk)
Do I need to open up the walls myself?
Only where building control asks to see concealed work. We tell you which parts are likely, and often a camera or a few small holes is enough.
Put the work on the record
Send the address and what was built. We reply with the route and a fixed fee, from £615 drawings + £150 survey (£765 total).