The two bills
Ours is £515 drawings + £150 survey (£665 total). It covers the measured survey of your house, the existing and proposed plans, elevations and sections, the location and block plans, and the forms. The location and block plans are included, which is why we do not quote them separately inside a planning job.
The council’s is £548 for altering or extending one house. It is paid with the application and is not ours, which is why it never appears inside our price.
What “valid” means, and why it is a drawing problem
An application is only decided once it is valid. The planning guidance lists four things: a completed form, the national information requirements, the correct fee and the council’s local information requirements.
The plans are part of the national requirements. They must be drawn to an identified scale, plans must show north, and a location plan should usually be at 1:1250 or 1:2500 with the application site edged red and any other land you own edged blue. A set that misses any of these is returned before an officer looks at the design.
Why one borough asks for more than another
The fourth item, the local list, is where London boroughs differ. A council may ask for supporting information such as a design statement or heritage assessment, but only if it is on a formally adopted local list published on its website less than two years before the application, and lists must be reviewed at least every two years.
We check your borough’s current list before drawing, so the supporting documents are in the package and not asked for after submission.
There is one more document to get right: the ownership certificate. The guidance describes four versions, A to D, depending on whether you are the sole owner and whether you know the other owners, and an application is not valid until the right one is completed.
How long it takes, and what to expect
For development that is not major, the council has 8 weeks from the day after it receives a valid application, unless a longer period is agreed in writing. In practice English councils decided 145,600 householder applications in the year to June 2026, and 93% within 8 weeks or an agreed time.
Our drawings are ready about 7 days after the survey. After that, we check them independently, submit them for you and answer the council’s questions, with free redraws until approval.
By the numbers
£548
Council fee for altering or extending one house in England from 1 April 2026.
Source: Planning fees: annual indexation from 1 April 2026 (GOV.UK)
4 items
A valid application needs a form, national information, the correct fee and the local information requirements.
Source: Making an application, planning practice guidance (GOV.UK)
1:1250
The typical scale of a location plan, alongside 1:2500, with the site edged in red.
Source: Making an application, planning practice guidance (GOV.UK)
2 years
How recently a council’s local list must have been published, and how often it must be reviewed.
Source: Making an application, planning practice guidance (GOV.UK)
A to D
The four ownership certificates, depending on who owns the land and what you know about them.
Source: Making an application, planning practice guidance (GOV.UK)
8 weeks
The council’s time to decide an application that is not major development.
145,600
Householder applications decided by English councils in the year to June 2026.
Source: Planning applications in England: April to June 2026, section 3.15 householder developments (GOV.UK)
93%
Share of those decided within 8 weeks or the agreed time.
Source: Planning applications in England: April to June 2026, section 3.15 householder developments (GOV.UK)
Planning drawing costs: common questions
Is the council fee included in your price?
No. The council’s fee is paid to the council with the application, and is not ours. We tell you the exact fee for your project at the start so you can budget for both.
Source: Planning fees: annual indexation from 1 April 2026 (GOV.UK)
Do I need to pay for location and block plans separately?
Not inside a planning job: they are part of the set. If you only need those plans, we sell them on their own.
What if the council returns the application as invalid?
We correct our own sheets and resubmit at no charge, because redraws are free until approval. The usual causes are a missing scale, north point, certificate or local-list document.
Source: Making an application, planning practice guidance (GOV.UK)
Sources
- Making an application, planning practice guidance (GOV.UK)
- Planning fees: annual indexation from 1 April 2026 (GOV.UK)
- Town and Country Planning (Development Management Procedure) Order 2015, article 34 (legislation.gov.uk)
- Planning applications in England: April to June 2026, section 3.15 householder developments (GOV.UK)
About the author. Ben Shaukat is Managing Director of Property Architecture Ltd, which trades as Planning Drawings.
Published by Planning Drawings. Checked against the sources above on . Planning rules change; check your council before you build.