How much does a planning amendment cost in London?

Changing a permission after it is granted is cheap if the change is small and dearer if the council calls it material.

By Ben Shaukat, Managing DirectorPublished 2 min read

Get a fixed fee for your house

We will send your fixed fee here.

Handy if a quick call is easier.

We check conservation areas and other limits for this address.

In a sentence or two: your plans, and any feedback from the council so far.

Optional. PDF, JPG, PNG, HEIC or DWG. Up to 10 files, 28 MB in total.

Write before 3pm and you hear back that working day.

We use your details only to answer this enquiry. Read our privacy notice.

Prefer WhatsApp? Send us a message · +44 7592 201353

Two routes, two council fees

After permission, a builder or a change of mind often moves a window, shifts a wall or changes a roof. Planning law gives two ways to make that change without starting again. One is a non-material amendment under section 96A. The other is a section 73 application, which can vary the conditions on a permission.

The council fee for the first is £46 on householder development and £309 in any other case. For the second, removal or variation of a condition, it is £89 for a householder application. Our fee for either is £285.

From first enquiry to a planning decisionA vertical timeline of eight steps: enquiry and constraints check, measured survey, drawings in about 7 days after the survey, you approve the design, an independent check by a second technologist, submission, validation by the council, then the council decision, which for a householder application has a statutory period of 8 weeks from the day after the council receives a valid application.Enquiry and constraints checkRoute chosen, fixed quote sentMeasured surveyThe house as it stands, on one datumDrawingsAbout 7 days after the surveyYou approve the designFrozen in writingIndependent checkA second technologist checks every sheetSubmissionForms, plans and fee to the councilValidationThe council confirms the application is completeDecisionHouseholder: 8 weeks from a valid application
Fig. 1 From first enquiry to a planning decision · Source: Planning Practice Guidance: determining a planning application (GOV.UK)

What counts as non-material

There is no list. The guidance says there is no statutory definition of non-material, because it depends on the context of the whole scheme: a change that is non-material in one scheme may be material in another.

So the officer decides on the facts, and we draw the before and after so the difference is plain. A few centimetres on a window position in a large scheme is usually easy. Raising the ridge on a loft that already tests the limits of its neighbours is not.

How quickly it moves, and who must be told

A non-material amendment is quick. The time to determine is 28 days, or a longer period agreed in writing. It has no consultation requirements, but before applying you must notify owners of the land affected, who then have 14 days to make representations.

The council must issue its decision in writing. The decision is not a reissue of the permission: the original still stands, and the two documents are read together.

When the change is bigger than it looks

If the council considers the change material, the quick route cannot be used. The same guidance says this procedure cannot be used to make a material amendment, and that it applies only to planning permissions, not to listed building consents.

For a bigger change, section 73 is the next step. It takes effect as a new, independent permission alongside the original, with new or amended conditions. It cannot extend the time limit for starting or change the description of the development.

We read the permission and its conditions first, and tell you which route fits before you pay the council anything.

By the numbers

Planning amendment costs: common questions

Can I make a non-material amendment to a listed building consent?

No. The guidance says the procedure cannot be used for listed building consents; it applies only to planning permissions.

Source: Flexible options for planning permissions, planning practice guidance (GOV.UK)

Does the original permission stay in force?

Yes. A non-material amendment decision is not a reissue, so the original permission stands and the two are read together. A section 73 permission sits alongside the original, and you choose which to build.

Source: Flexible options for planning permissions, planning practice guidance (GOV.UK)

What if my change is refused as material?

Then a section 73 application, or a fresh application, is the next route. We redraw our own sheets free until approval.

Sources

  1. Flexible options for planning permissions, planning practice guidance (GOV.UK)
  2. Planning fees: annual indexation from 1 April 2026 (GOV.UK)
  3. Town and Country Planning Act 1990, section 96A: non-material changes (legislation.gov.uk)

About the author. Ben Shaukat is Managing Director of Property Architecture Ltd, which trades as Planning Drawings.

Published by Planning Drawings. Checked against the sources above on . Planning rules change; check your council before you build.

Planning amendment

from £285

Fixed fee
£285
VAT
None to add

£285. A starting fee: we confirm one fixed figure after checking your address. The council’s own fee, where there is one, is paid to the council.

Get my fixed fee

Ask for a fixed fee for your drawings

Tell us the address and what you have in mind. We check the property and reply with the route and a fixed fee, no VAT to add.

Call 020 7131 9705WhatsApp +44 7592 201353

Back to the form