How much do basement conversion drawings cost in London?

Digging down is the most expensive drawing job we do, and the law treats it differently from building up or out.

By Ben Shaukat, Managing DirectorPublished 3 min read

Get a fixed fee for your house

We will send your fixed fee here.

Handy if a quick call is easier.

We check conservation areas and other limits for this address.

In a sentence or two: your plans, and any feedback from the council so far.

Optional. PDF, JPG, PNG, HEIC or DWG. Up to 10 files, 28 MB in total.

Write before 3pm and you hear back that working day.

We use your details only to answer this enquiry. Read our privacy notice.

Prefer WhatsApp? Send us a message · +44 7592 201353

Why this is our highest drawing fee

A loft sits on a structure that exists. A basement creates one. The drawings cover the existing house, the new floor level, the retaining walls, the stair, the lightwell and the junction with the neighbour’s foundations, and every one of those sheets is also a structural question.

Our fee is £1,705 drawings + £150 survey (£1,855 total). That buys the measured survey, the planning set and the coordination with your structural engineer, whose calculations are priced separately at £389 for the standard case. A basement with unusual ground or a deep dig will need more engineering than that.

The same wall, drawn for planning and for building regulationsTwo drawings of one extension wall side by side. The planning drawing shows the outline, the window and the facing material. The building regulations drawing of the same wall adds the layers inside it: brick outer leaf, insulated cavity, block inner leaf and plaster, a steel beam over the opening, the damp-proof course and the foundation below ground.Planning drawingBuilding regs drawingBrick tomatch houseSteel beamCavity insulationDamp-proof courseFoundationBlock inner leaf
Fig. 1 The same wall, drawn for planning and for building regulations

Why digging down needs planning permission

Section 55 of the Planning Act says that works affecting only the inside of a building are not development. It then carves out one exception: works for providing additional space underground do count. So converting a cellar that exists is usually internal work, while excavating new space is development.

That is why a basement project is a planning application in practice. The council fee for one house is £548, and many councils ask for an engineer’s statement showing how the digging will be done without harming the neighbours.

One borough’s limits, as an example

Boroughs write their own tests. Kensington and Chelsea’s Policy CL7, adopted in January 2015 and explained in its April 2016 Basements SPD, limits a basement to 50% of each garden and to one storey. It also asks for a minimum of one metre of soil above any part of the basement beneath the garden.

That one borough is not a rule for London. Policy numbers change when a local plan is replaced, so check the current plan for your address before you design. We do that check at the start, and draw the garden area and the soil depth where your borough asks for them.

Fire, light and the neighbour’s foundations

Under Approved Document B, a basement with habitable rooms needs either an emergency escape window or external door, or a protected stairway to a final exit. The escape window must have an openable area of at least 0.33 square metres, at least 450 millimetres high and wide, with its bottom edge no more than 1,100 millimetres above the floor.

Digging near next door brings the Party Wall Act in. Section 6 applies where the excavation is within 3 metres of a neighbouring building and goes below its foundations, or within 6 metres on a 45-degree line, and it asks for one month’s notice that says whether you will underpin.

Community Infrastructure Levy is rarely the worry. GOV.UK guidance says development under 100 square metres is generally exempt, unless it creates a new dwelling.

By the numbers

Basement drawing costs: common questions

Is a cellar conversion cheaper than a new basement?

Often yes, because turning an existing cellar into a room can be internal work that does not need planning permission under section 55. Our survey tells you which side of that line you are on.

Source: Town and Country Planning Act 1990, section 55: meaning of development (legislation.gov.uk)

Does the drawing fee include the structural engineer?

No. We coordinate with your engineer and show their design on our drawings. The calculations are a separate fixed-fee service, and a deep or complex basement may need more than the standard package.

Do I need to tell my neighbours?

Almost always. If you dig near their building below its foundations, the Party Wall Act asks for one month’s notice. Even where it does not, councils with basement policies encourage you to consult neighbours before applying.

Source: Party Wall etc. Act 1996, section 6: adjacent excavation and construction (legislation.gov.uk) · Basements Supplementary Planning Document, April 2016 (Royal Borough of Kensington and Chelsea)

Sources

  1. Town and Country Planning Act 1990, section 55: meaning of development (legislation.gov.uk)
  2. Planning fees: annual indexation from 1 April 2026 (GOV.UK)
  3. Basements Supplementary Planning Document, April 2016 (Royal Borough of Kensington and Chelsea)
  4. Approved Document B, volume 1: dwellings, paragraphs 2.10 and 2.16 (GOV.UK)
  5. Party Wall etc. Act 1996, section 6: adjacent excavation and construction (legislation.gov.uk)
  6. Community Infrastructure Levy, planning practice guidance (GOV.UK)

About the author. Ben Shaukat is Managing Director of Property Architecture Ltd, which trades as Planning Drawings.

Published by Planning Drawings. Checked against the sources above on . Planning rules change; check your council before you build.

Basement drawings

from £1,855

Drawings
£1,705
Measured survey
£150
Total you pay
£1,855
VAT
None to add

£1,705 drawings + £150 survey (£1,855 total). A starting fee: we confirm one fixed figure after checking your address. The council’s own fee, where there is one, is paid to the council.

Get my fixed fee

Ask for a fixed fee for your drawings

Tell us the address and what you have in mind. We check the property and reply with the route and a fixed fee, no VAT to add.

Call 020 7131 9705WhatsApp +44 7592 201353

Back to the form