How much does a construction and tender drawing package cost in London?

The set that lets several builders price the same job, so the quotes can be compared like for like.

By Ben Shaukat, Managing DirectorPublished 1 min read

Get a fixed fee for your house

We will send your fixed fee here.

Handy if a quick call is easier.

We check conservation areas and other limits for this address.

In a sentence or two: your plans, and any feedback from the council so far.

Optional. PDF, JPG, PNG, HEIC or DWG. Up to 10 files, 28 MB in total.

Write before 3pm and you hear back that working day.

We use your details only to answer this enquiry. Read our privacy notice.

Prefer WhatsApp? Send us a message · +44 7592 201353

What a tender set adds

A building regulations set shows that the work can be built to the rules. A tender set shows exactly what to build: materials, finishes, fixings and the standard of workmanship, in a specification that sits beside the drawings. Our fee is £945.

Without it, builders price different things and the most basic quote may simply be the thinnest one.

The same wall, drawn for planning and for building regulationsTwo drawings of one extension wall side by side. The planning drawing shows the outline, the window and the facing material. The building regulations drawing of the same wall adds the layers inside it: brick outer leaf, insulated cavity, block inner leaf and plaster, a steel beam over the opening, the damp-proof course and the foundation below ground.Planning drawingBuilding regs drawingBrick tomatch houseSteel beamCavity insulationDamp-proof courseFoundationBlock inner leaf
Fig. 1 The same wall, drawn for planning and for building regulations

How it fits the approvals

Building control approves the structure and safety, not the finish. GOV.UK describes full plans as the most thorough route, with a decision within 5 weeks, or 2 months with your consent. The tender set should follow the approved drawings so the price and the approval describe the same building.

Who is responsible on site

Where more than one contractor will work on a project, the client must appoint a principal designer and a principal contractor in writing. If the client fails to appoint a principal designer, the client must fulfil the principal designer duties. We explain your position when the package is issued, as general information rather than legal advice.

By the numbers

Tender packages: common questions

Do I need a tender set for a small extension?

Not always. A builder you trust can price from the building regulations set. A tender set pays for itself when you want several quotes.

Does it include the structural calculations?

No. Those are a separate fixed-fee service.

Can the tender set be used for the building control application?

The approval set and tender set overlap. We tell you which sheets go where.

Source: Building regulations approval: how to apply (GOV.UK)

Sources

  1. Building regulations approval: how to apply (GOV.UK)
  2. The Construction (Design and Management) Regulations 2015, regulation 5 (legislation.gov.uk)

About the author. Ben Shaukat is Managing Director of Property Architecture Ltd, which trades as Planning Drawings.

Published by Planning Drawings. Checked against the sources above on . Planning rules change; check your council before you build.

Construction and tender drawing package

from £945

Fixed fee
£945
VAT
None to add

£945. A starting fee: we confirm one fixed figure after checking your address. The council’s own fee, where there is one, is paid to the council.

Get my fixed fee

Ask for a fixed fee for your drawings

Tell us the address and what you have in mind. We check the property and reply with the route and a fixed fee, no VAT to add.

Call 020 7131 9705WhatsApp +44 7592 201353

Back to the form