Skip to content
Planning Drawings020 7131 9705Get a fixed fee
Menu
A dark slate-clad roof extension with windows and a small balcony on the back of a yellow-brick London terrace at sunset

Mansard lofts

How much does a mansard loft conversion drawing cost in London?

A mansard rebuilds the roof, so it is a planning job with a council fee, a heritage test and a stricter fire route.

By Ben Shaukat, Managing DirectorPublished 3 min read

Get a fixed fee for your house

We will send your fixed fee here.

Handy if a quick call is easier.

We check conservation areas and other limits for this address.

In a sentence or two: your plans, and any feedback from the council so far.

Optional. PDF, JPG, PNG, HEIC or DWG. Up to 10 files, 28 MB in total.

Write before 3pm and you hear back that working day.

We use your details only to answer this enquiry. Read our privacy notice.

Prefer WhatsApp? Send us a message · +44 7592 201353

Why the mansard fee is above a standard loft

A dormer sits on the existing roof. A mansard replaces it, with a steep lower slope, a flatter upper slope and small windows set into the steep face. Every part of that is a drawn detail: the profile, the cladding, the junction with the neighbour’s roof and the parapet.

Our fee is £615 drawings + £150 survey (£765 total), with the survey in the total. The roof has to be measured accurately, because the drawings fix the height of the ridge, the width of the party walls and the depth of the new floor.

The sheets in a typical householder planning setSix drawing sheets laid out in a grid: a location plan with a red line round the plot, a block plan showing the house and the extension on the plot, existing and proposed floor plans, existing and proposed elevations, a roof plan, and a section through the extension.Location plan1:1250Block planFloor plansExistingProposedElevationsRoof planSection
Fig. 1 The sheets in a typical householder planning set · Source: Planning Practice Guidance: making an application (GOV.UK)

Why a mansard needs planning permission

Under Class B a roof addition may not extend beyond the plane of the roof slope that faces the highway, and may not exceed the highest part of the existing roof. It is also limited to 40 cubic metres on a terraced house. A full mansard breaks the first rule and usually the volume limit.

There is a second barrier in much of London. The Class B right does not apply on article 2(3) land, which includes conservation areas. So in most places where mansards are traditional, an application is the only route, and the fee is £548 for one house.

What a council looks for in the drawing

Councils publish their own tests for mansards. One example is Tower Hamlets’ draft mansard roof guidance note of November 2015, a consultation draft rather than adopted policy. It describes a steep lower pitch of about 70 degrees under an upper pitch of 30 to 36 degrees, and says a flat-top mansard may be considered only exceptionally, where neighbours already have one.

The same draft prefers keeping the original V-shaped back wall where the house had a butterfly roof, so that the older roof form still shows. Always check the current guidance of your own borough; ours is a style example, not a rule for every street.

We draw the profile at the borough’s own angles, set the slopes against your neighbours’ and show the parapet on the elevation, so the officer can compare it with the policy page by page.

Fire route, stair headroom and the party wall

On a typical two-storey house a mansard adds a storey above 4.5 metres, so Approved Document B asks for fire-resisting doors and partitions on the escape route, or the sprinkler alternative it describes in paragraph 2.23. The stair needs 2 metres of headroom, reducing to 1.9 metres at the centre and 1.8 metres at the edge in a loft conversion.

A mansard usually means raising or cutting into the party wall, so the Party Wall Act notice has to be served at least two months before work starts. Islington, for one, has removed permitted development rights in 40 of its 42 conservation areas, so check the street before you pick the date.

By the numbers

Mansard drawing costs: common questions

Is a mansard more than a dormer in total cost?

Our drawing fee is higher, and so is the build, because the whole roof is replaced. The council fee is the same £548 if a dormer also needs permission.

Source: Planning fees: annual indexation from 1 April 2026 (GOV.UK)

Will the council accept a flat-top mansard?

It depends on the street. Some councils, in draft or adopted guidance, prefer a traditional two-pitch roof and allow a flat top only where neighbours already have one. We check your borough’s guidance first and quote what it says.

Source: Draft Mansard Roof Guidance Note, London Borough of Tower Hamlets, consultation draft, November 2015 (copy hosted by the Roman Road Trust)

Do I need a heritage statement?

If the house is listed or in a conservation area, the council may ask for one with the application. Our heritage statement is a separate, fixed-fee service.

Sources

  1. General Permitted Development Order 2015, Schedule 2, Part 1, Class B: roof additions (legislation.gov.uk)
  2. Planning fees: annual indexation from 1 April 2026 (GOV.UK)
  3. Approved Document B, volume 1: dwellings, paragraphs 2.21 to 2.23 loft conversions (GOV.UK)
  4. Approved Document K: protection from falling, collision and impact, paragraphs 1.11 to 1.13 (GOV.UK)
  5. Party Wall etc. Act 1996, section 3: party structure notices (legislation.gov.uk)
  6. Draft Mansard Roof Guidance Note, London Borough of Tower Hamlets, consultation draft, November 2015 (copy hosted by the Roman Road Trust)
  7. Planning permission and permitted development in Islington (Islington Council)

About the author. Ben Shaukat is Managing Director of Property Architecture Ltd, which trades as Planning Drawings.

Published by Planning Drawings. Checked against the sources above on . Planning rules change; check your council before you build.

Mansard loft conversion drawings

from £765

Drawings
£615
Measured survey
£150
Total you pay
£765
VAT
None to add

£615 drawings + £150 survey (£765 total). A starting fee: we confirm one fixed figure after checking your address. The council’s own fee, where there is one, is paid to the council.

Get my fixed fee

Ask for a fixed fee for your drawings

Tell us the address and what you have in mind. We check the property and reply with the route and a fixed fee, no VAT to add.

Call 020 7131 9705WhatsApp +44 7592 201353

Back to the form