Skip to content
Planning Drawings020 7131 9705Get a fixed fee
Menu
The back of a semi-detached house with a rendered extension in blockwork under construction, scaffolding and building materials on the lawn

Prior approval

How much does prior approval for a larger extension cost in London?

Reaching 6 or 8 metres without a full planning application costs two modest bills, and a neighbour’s letter can change the outcome.

By Ben Shaukat, Managing DirectorPublished 2 min read

Get a fixed fee for your house

We will send your fixed fee here.

Handy if a quick call is easier.

We check conservation areas and other limits for this address.

In a sentence or two: your plans, and any feedback from the council so far.

Optional. PDF, JPG, PNG, HEIC or DWG. Up to 10 files, 28 MB in total.

Write before 3pm and you hear back that working day.

We use your details only to answer this enquiry. Read our privacy notice.

Prefer WhatsApp? Send us a message · +44 7592 201353

The two bills, side by side

The first is ours, £375 drawings + £150 survey (£525 total). It covers the survey and the plan, description and height details the council asks for. The second is the council’s, £249 from 1 April 2026.

For comparison, a full householder application for the same project would cost the council’s £548 and would not stop a planning officer judging the design as well as the neighbours’ amenity. In prior approval only amenity is judged.

Single-storey rear extension limits under permitted developmentA section through a house with a single-storey rear extension. The extension may project up to 3 metres from the rear wall of an attached house, or 4 metres for a detached house, and may be no more than 4 metres high. Where it is within 2 metres of a boundary, its eaves may be no higher than 3 metres. A note adds that extensions and other buildings may not cover more than half the land around the original house.Originalhouse3 m attached · 4 m detached4 mmaxEaves max 3 m within 2 m of a boundaryNo more than half the land around theoriginal house may be covered.
Fig. 1 Single-storey rear extension limits under permitted development · Source: GPDO 2015, Schedule 2, Part 1, Class A (legislation.gov.uk)

What you must give the council

The order lists the package. Before starting, you provide a written description of how far the extension goes past the rear wall, its maximum height and its eaves height, a plan of the site showing the extension, the addresses of adjoining premises and your contact details, with the fee.

The council may refuse if the information is insufficient to show that the limits are met. That is the most avoidable refusal, which is why our package puts every length and height on the plan, measured on site rather than estimated.

What your neighbours can and cannot do

The council must send each adjoining owner or occupier a notice, giving at least 21 days for representations. If any of them objects, the council’s prior approval is required on one question only: the impact of the extension on the amenity of adjoining premises, and it must consider all adjoining premises, not just the ones that wrote.

So an objection does not decide the result, but it moves you from a quick notification to a proper decision. If the council has not told you anything within 42 days of receiving your information, you may begin.

Where this route does not apply

The 6 and 8 metre limits are not available on article 2(3) land, such as conservation areas, or on a site of special scientific interest. There, the 3 and 4 metre limits stay, and anything longer needs a full application.

The extension must still be single storey and no more than 4 metres high. Everything else in Class A applies as for a normal extension: similar materials, the half-garden limit and the 3-metre eaves rule within 2 metres of a boundary.

After the approval comes the part the order does not do for you: building regulations drawings, structural calculations at £389 and any party wall notice.

By the numbers

Prior approval costs: common questions

Is a neighbour’s objection the end of the application?

No. It means the council has to decide whether the extension harms the amenity of adjoining homes, and it may grant approval with conditions. It does not give neighbours a veto.

Source: General Permitted Development Order 2015, Schedule 2, Part 1, Class A, paragraphs A.1(g) and A.4 (legislation.gov.uk)

Do I still need a Lawful Development Certificate?

Not for the extension itself: the prior approval decision is your proof. A certificate is a separate application, with its own fee.

What if the council refuses?

A refusal can be appealed, and we can redraw our own sheets free until approval. If the problem is the length, the alternative is a shorter extension within the 3 or 4 metre limits, which needs no application.

Source: General Permitted Development Order 2015, Schedule 2, Part 1, Class A, paragraphs A.1(g) and A.4 (legislation.gov.uk)

Sources

  1. General Permitted Development Order 2015, Schedule 2, Part 1, Class A, paragraphs A.1(g) and A.4 (legislation.gov.uk)
  2. Planning fees: annual indexation from 1 April 2026 (GOV.UK)
  3. Planning applications in England: April to June 2026, section 3.18 permitted development rights (GOV.UK)

About the author. Ben Shaukat is Managing Director of Property Architecture Ltd, which trades as Planning Drawings.

Published by Planning Drawings. Checked against the sources above on . Planning rules change; check your council before you build.

Prior approval for a larger home extension

from £525

Drawings
£375
Measured survey
£150
Total you pay
£525
VAT
None to add

£375 drawings + £150 survey (£525 total). A starting fee: we confirm one fixed figure after checking your address. The council’s own fee, where there is one, is paid to the council.

Get my fixed fee

Ask for a fixed fee for your drawings

Tell us the address and what you have in mind. We check the property and reply with the route and a fixed fee, no VAT to add.

Call 020 7131 9705WhatsApp +44 7592 201353

Back to the form