
Wraparound extension drawings from £1,005
A wraparound fills the side return and the back in one go, so the kitchen becomes the width of the house. We draw it as one scheme and work out which rules it has to meet.
£1,005 £855 drawings + £150 survey (£1,005 total), no VAT to add
Prefer WhatsApp? Send us a message · +44 7592 201353
The short answer
A wraparound extension combines a side return and a rear extension into one L-shaped addition. The two parts are tested together under permitted development, so the combined result matters more than either part. Our fee is £855 drawings + £150 survey (£1,005 total), no VAT to add; the council fee is separate.
Wraparound extension drawings
from £1,005
- Drawings
- £855
- Measured survey
- £150
- Total you pay
- £1,005
- VAT
- None to add
- A measured survey of the house, the side return, the garden and the neighbours’ windows on both sides
- Existing and proposed plans, elevations and sections of the combined extension, including the roof and rooflights
- A test of the combined scheme against each permitted development limit, to pick the route
- The prior approval notification, Lawful Development Certificate or householder application, submitted for you
- A check of the sewer records and a list of the party wall notices to serve
- An independent check of every sheet, and free redraws of our drawings until approval
£855 drawings + £150 survey (£1,005 total). A starting fee: we confirm one fixed figure after checking your address. The council’s own fee, where there is one, is paid to the council.
Get my fixed feeHow a wraparound runs with us
Route check
We test the whole extension against the order, because the side and rear parts add up, and say which application suits.
Survey
Both sides of the house and the garden are measured, with the neighbours’ windows and any existing extensions.
Options
We show the scheme at its fullest and at the depth that stays inside the quickest route, side by side.
Drawings and application
The chosen scheme is drawn in full and submitted by the route that fits.
Technical set
The building regulations set follows, with beam sizes, drainage and rooflight details for building control.
Why the wraparound is a special case for permitted development
Each part of a wraparound has its own limits. The rear part may reach 3 metres on a terrace or semi and 4 metres on a detached house, or 6 and 8 metres through prior approval. The side part must be single storey, no more than 4 metres high and no wider than half the width of the original house. The details are in Class A of the order.
The catch is the total. Class A also tests the total enlargement, the enlarged part together with any existing enlargement it joins, against those limits. In a conservation area, an extension beyond a side wall is not permitted development at all, which is why many wraparounds on Victorian terraces need a householder application.
- Rear: 3 m / 4 m, or 6 m / 8 m with prior approval; 4 m high
- Side: single storey, no wider than half the original house
- Existing extensions count towards the total
- No side extension in a conservation area under permitted development
Choosing between the routes
If every part fits, a Lawful Development Certificate gives proof. If the rear part is 6 or 8 metres, the prior approval route applies, with a council fee of £249 against £548 for a householder application, according to the GOV.UK fee schedule.
A householder application gives the most design freedom and takes longer. The right choice depends on the house and on the neighbours, and we explain it with the drawings in front of you.
Side return extension drawings · Prior approval for a larger home extension
Drains and neighbours at both edges
A wraparound often sits over the drain that runs along the side and the back of the house. Approved Document H applies to building over or within 3 metres of the centre line of a sewer on the water company’s records, so we search the records before the design is fixed.
The boundary walls at both sides are likely to need party wall notices, with two months’ notice required before work on a party structure (section 3). We list them and, if you wish, prepare them.
Wraparounds in numbers
4 m
Highest a permitted development side or rear extension of a single storey may be.
Source: GPDO 2015, Schedule 2, Part 1, Class A: enlargement of a dwellinghouse (legislation.gov.uk)
½ width
A side extension may be no wider than half the width of the original house.
Source: GPDO 2015, Schedule 2, Part 1, Class A: enlargement of a dwellinghouse (legislation.gov.uk)
3 m / 4 m
Deepest single-storey rear part under permitted development: terrace or semi, detached.
Source: GPDO 2015, Schedule 2, Part 1, Class A: enlargement of a dwellinghouse (legislation.gov.uk)
6 m / 8 m
Deepest rear part through prior approval, outside conservation areas and similar land.
Source: GPDO 2015, Schedule 2, Part 1, Class A: enlargement of a dwellinghouse (legislation.gov.uk)
Total
The enlarged part together with any existing enlargement it joins must stay within the limits.
Source: GPDO 2015, Schedule 2, Part 1, Class A: enlargement of a dwellinghouse (legislation.gov.uk)
£249
Council fee for prior approval of a larger rear extension from 1 April 2026.
Source: Planning fees: annual indexation from 1 April 2026 (GOV.UK)
£548
Council fee for a householder application from 1 April 2026.
Source: Planning fees: annual indexation from 1 April 2026 (GOV.UK)
3 m
Distance from a sewer’s centre line within which building over sewers rules apply.
Source: Approved Document H: drainage and waste disposal, 2015 edition (GOV.UK)
2 months
Notice required before work on a party structure begins.
Source: Party Wall etc. Act 1996, section 3 (legislation.gov.uk)
Questions about wraparounds
Is a wraparound the same as a side return plus a rear extension?
Physically yes, but the council treats the total as one enlargement, so the two parts cannot each use up the full allowance. We draw and test them together.
Can I build the side return first and the rear later?
Yes, but the later part is judged with the first, so the order and the total matter. We draw the whole scheme and can phase it.
Will the neighbours object?
A wraparound affects both neighbours’ outlook along the boundary. Drawing their windows and the roof height at the fence line, as we do, answers most concerns early.
What is the glass roof rule?
A rooflight is part of the extension and must meet the insulation limits in building regulations, which we draw. See building regulations drawings.
Get the whole back of the house in one scheme
Send the address and a photo of the back and side. We reply with the route and a fixed fee, from £855 drawings + £150 survey (£1,005 total).